Choose the standard
Raw state, shell units, turnkey state.
We can divide building of individual houses on three work stages: raw state, . Underneath we present range of works, which enclose every stage.
Raw state contains:
- geodesic setting out of building,
- diggings,
- combined footings,
- walls footing,
- sund bed under zero state concrete base,
- sewerage zero state,
- sewer, hydrous, energetic culverts,
- thermal insulation and zero state moisured culverts,
- external and internal main walls,
- division walls,
- ceilings, columns, binders, curbs,
- reinforced concrete stairs,
- roof framing,
- roofing with guttering,
- chimneys,
- chimneys finish above the roof.
Shell units contains:
- external windows and doors and garaged gate,
- warm and cold system and sewerage distribution,
- central heating distribution, floor heating,
- electric, alarm, TV, telephone system distribution,
- facade with insulating and pedestal
- false ceiling,
- external parapet walls,
- internal plasters,
- concrete screeds with insulation,
- roof insulating,
- carton – gypsum plates.
Turnkey state contains:
- complete boiler house with heaters,
- internal parapet walls,
- walls and floors finish (painting, glazing),
- white fittings assembly (shower, bath, wash-basin, water closet, wash-basin batter and so on),
- interal and external stairs facing, carrying out of balustrades,
- external door,
- small architecture (approach roads, approaches, lawns, green implanting),
- fencing,
- terminals (hydrous, seweraged, energetic, gas).

You don't want to finish Your's house? We do it for You.